Frictional temperature regulation of a fluid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11724239
APP PUB NO 20210190271A1
SERIAL NO

16722062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production method can include flowing a heterogeneous fluid mixture into contact with a homogenizing cutting tool, measuring a fluid mixture temperature so as to obtain a measured fluid mixture temperature, and determining a target fluid mixture temperature. The fluid mixture can be frictionally heated so as to obtain a heated and homogenized fluid mixture by driving the cutting tool at a rate based on (i) the target fluid mixture temperature and (ii) the measured fluid mixture temperature. The heated and homogenized fluid mixture can be flowed away from the cutting tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KLUEBER LUBRICATION MUENCHEN SE & CO KGGEISENHAUSENERSTRASSE 7 MUENCHEN 81379

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bodesheim, Guenther Munich, DE 1 0
Koehler, Christian Munich, DE 47 341
Loderer, Dirk Gilching, DE 8 9
Ludwig, Dirk Olching, DE 1 0
Smola, Anton Augsburg, DE 1 0
Werner, Bastian Markt Schwaben, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 15, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00