Method for manufacturing a micromechanical layer structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11405010
APP PUB NO 20210167745A1
SERIAL NO

16770452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a micromechanical layer structure, including: providing a first protective layer patterned to have at least one opening which is filled with sacrificial layer material; depositing a functional-layer layer structure; producing a first opening in the functional-layer layer structure to at least one opening of the first protective layer, so that in at least one of the layers of the functional-layer layer structure; depositing a second protective layer so that the first opening is filled with material of the second protective layer; patterning the second protective layer and the filled first opening to have a second opening to the first protective layer, the second opening having the same or a lesser width than the first opening; removing sacrificial layer material at least in the opening of the first protective layer; and removing protective layer material at least in the second opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Majoni, Stefan Weil Im Schoenbuch, DE 7 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00