Structurally cross-tied energy cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11563257
APP PUB NO 20210151729A1
SERIAL NO

16684405

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, methods, and apparatus for a structurally cross-tied energy cell are disclosed. In one or more embodiments, a battery comprises a plurality of battery cells, each comprising an anode layer and a cathode layer. The battery further comprises a plurality of anode cross ties electrically connected to at least some of the anode layers of the battery. Further, the battery comprises a plurality of cathode cross ties electrically connected to at least some of the cathode layers of the battery. In one or more embodiments, the anode cross ties and the cathode cross ties run through all of the battery cells of the battery. In at least one embodiment, the anode cross ties and the cathode cross ties are manufactured from an electrical conductor material. In some embodiments, the anode cross ties and the cathode cross ties each comprise conductive protrusions, which are located external to the battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernhardt, Roger D St. Charles, US 29 185

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 24, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00