Paper shredder with paper limiter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11084041
APP PUB NO 20210086190A1
SERIAL NO

16576711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A paper shredder has a paper tray, a paper inlet, a shredder cover, a paper pressing plate, paper pick-up rollers, a shredder cutter shaft, a motor, a wastepaper barrel, and a paper limiter. The paper tray carries a stack of to-be-shredded paper. The paper inlet guides to-be-shredded paper. The shredder cover end is connected to the shredder body by a rotary shaft, closing or opening the shredder body. The paper pressing pl presses the stack in the paper tray. The paper pick-up rollers are on one side of the paper inlet, feeding the paper tray stack into the paper inlet. The shredder cutter shaft shreds the to-be-shredded paper. The motor drives the shredder cutter shaft to operate. The wastepaper barrel is located below the paper inlet to collect shredded paper. The paper limiter is limits one of a thickness or a length of the stack placed in the paper tray.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AURORA OFFICE EQUIPMENT CO LTD SHANGHAINO 388 JIAXIN ROAD MALU TOWN JIADING DISTRICT SHANGHAI 201818 SHANGHAI CITY SHANGHAI CITY 201818

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Guanglong Shanghai, CN 18 12
Chuang, Tao Kuei Shanghai, CN 3 0
Tsai, Chung Shih Hawthorne, US 21 16
Zhong, Er Ren Shanghai, CN 6 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00