Integrated optical/electrical probe card for testing optical, electrical, and optoelectronic devices in a semiconductor die

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10996081
APP PUB NO 20210080295A1
SERIAL NO

16570926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A test system includes a semiconductor die and an integrated optical/electrical probe card. Electrical, optical, and optoelectronic devices reside in the semiconductor die. Electrical pads in the semiconductor die connect to the electrical and optoelectronic devices. Grating couplers in the semiconductor die connect to the optical device and optoelectronic devices. The electrical pads and grating couplers are interspersed in substantially a single line in the semiconductor die. The integrated optical/electrical probe card interfaces with the electrical pads by electrical needles, and concurrently interfaces with the grating couplers by optical fibers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEWPORT FAB LLC DBA JAZZ SEMICONDUCTOR4321 JAMBOREE ROAD NEWPORT BEACH CA 92660

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Preisler, Edward San Clemente, US 41 82
Qamar, Yasir Corona, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 4, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00