Machine tool
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Mar 5, 2024
Grant Date -
Mar 11, 2021
app pub date -
Aug 3, 2018
filing date -
Aug 3, 2017
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Machine tools for machining or processing a workpiece can include at least one tool with at least one relative movement between the workpiece and the tool. The machine tool has at least one pressure line circuit with at least one pump unit and with at least one energy storage which is in flow connection with the pump unit via a pressure line, wherein the pump unit has at least one mechanically driven pump element for sucking in or sucking out a medium and is in flow connection with the pressure line, and the pump element is mechanically coupled to a component of the machine tool which is also moved during proper operation of the machine tool in such a way that the component moved by the machine tool drives the pump element.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NIENSTEDT GMBH | 45721 HALTERN AM SEE |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Groneberg, Jan | Berlin, DE | 3 | 1 |
# of filed Patents : 3 Total Citations : 1 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B29C Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 5, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 5, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 5, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
