Magnetoelastic resonator and method of manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11658638
APP PUB NO 20210067137A1
SERIAL NO

17006014

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resonator comprising a magnetoelastic body having a mass load portion and an active resonating portion can be used in implementations such as a security tag. The resonator includes a mass at the mass load portion of the magnetoelastic body. Displacement of the magnetoelastic body is configured to occur at both the mass load portion and the active resonating portion. A strain at the active resonating portion during displacement is configured to be greater than a strain at the mass load portion during displacement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE REGENTS OF THE UNIVERSITY OF MICHIGAN3003 STATE STREET ROOM 1072 ANN ARBOR MI 48109-1274

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gianchandani, Yogesh Ann Arbor, US 13 65
Green, Scott R Maumee, US 3 1
Jiang, Jiqing Mountain View, US 22 306
Nambisan, Ramprasad M Ann Arbor, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00