Transporting bitumen froth having coarse solids through a pipeline

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11402070
APP PUB NO 20210062976A1
SERIAL NO

16947939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transporting a bitumen froth having coarse solids having a particle size>180 μm through a pipeline is provided comprising injecting into the pipeline a bitumen froth slug having a lower temperature or a lower water content or both that the bitumen froth.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNCRUDE CANADA LTD IN TRUST FOR THE OWNERS OF THE SYNCRUDE PROJECT AS SUCH OWNERS EXIST NOW AND IN THE FUTURE9421 17 AVENUE NW EDMONTON ALBERTA T6N 1H4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anthieren, Gary Spruce Grove, CA 3 1
Reid, Kevin Edmonton, CA 21 79
Sanders, Sean Edmonton, CA 12 96
Schaan, Jason Okotoks, CA 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00