Nuclear materials apparatus and implementing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11715575
APP PUB NO 20210057118A1
SERIAL NO

17080966

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for supporting spent nuclear fuel including a plurality of wall plates arranged in an intersecting manner to define a basket apparatus extending along a longitudinal axis. The basket apparatus may include a plurality of fuel cells and a plurality of flux traps between adjacent fuel cells. A plurality of reinforcement members may be positioned in the flux traps and may extend between opposing ones of the wall plates that form the flux traps. Each of the wall plates may be a slotted wall plate. The slotted wall plates may be interlocked with one another to form the basket apparatus. Each of the slotted wall plates may include an upper edge, a lower edge, and a plurality of plate slots formed in each of the upper and lower edges. The plate slots of the slotted wall plates may receive intersecting slotted wall plates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOLTEC INTERNATIONALONE HOLTEC BOULEVARD CAMDEN NJ 08104

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Singh, Krishna P Jupiter, US 264 2861

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 1, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 1, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 1, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00