Power split and variable creep drive system for street sweeper or like specialty vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11530741
APP PUB NO 20210048093A1
SERIAL NO

17087047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power split and creep drive system for street sweeper or like specialty vehicle having a single engine is disclosed. The system intends to retrofit and convert on-highway truck chassis into specialty vehicles capable of performing work function and moving at creeping speed, such as a street sweeper. It includes a hydraulic work circuit or power-take-off (PTO) port, a planetary gear set, a hydraulic system comprising pumps and motors to drive the working devices and balance the demand between propulsion and work function such as sweeping. The planetary gear set includes an input shaft connecting to a transmission output shaft of the chassis, a first output shaft connecting to a hydraulic machine, and a second output shaft to vehicle propulsion drive shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FEDERAL SIGNAL CORPORATIONOAK BROOK IL 60523-2004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Xiaolun Naperville, US 17 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00