Process to prepare an activated carbon product and a syngas mixture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11427774
APP PUB NO 20210040404A1
SERIAL NO

16644373

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to a process to prepare an activated carbon product and a syngas mixture comprising hydrogen and carbon monoxide from a solid torrefied biomass feed comprising the following steps, (i) subjecting the solid biomass feed to a pyrolysis reaction thereby obtaining a gaseous fraction comprising hydrogen, carbon monoxide and a mixture of gaseous organic compounds and a solid fraction comprising of char particles, (ii) separating the solids fraction from the gaseous fraction, (iii) subjecting the gaseous fraction obtained in step (ii) to a continuously operated partial oxidation to obtain a syngas mixture further comprising water and having an elevated temperature and (iv) activating the char particles as obtained in step (ii) to obtain the activated carbon product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORRGAS TECHNOLOGY B V1081 CN AMSTERDAM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berends, Robert Hugo Deventer, NL 7 1
Post, Van Der Burg Robin Pieter Amsterdam, NL 6 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00