Mixer and assembly for air-conditioning a rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11414103
APP PUB NO 20200406939A1
SERIAL NO

16980925

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixer, which forms the core part of an air-conditioning assembly of a rail vehicle, has two inlets, an outlet, and a central region between the inlets and the outlet. A first inlet is connected to a fresh air supply, and a second inlet is connected to a circulating air supply such that fresh air and circulating air reach the central region, where the circulating air is mixed with the fresh air to obtain supply air. The central region is connected to the fresh air inlet via an opening, which forms a transition region between the fresh air inlet and the central region. The transition region contains a profiled section with a wing-shaped cross-section in the transition region where the supplied fresh air generates negative pressure along the transition region, and the circulating air is suctioned into the central region of the mixer with a boost from the negative pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY GMBHOTTO-HAHN-RING 6 MÜNCHEN D-81739

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Plinninger, Thomas Rosenheim, DE 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00