Tangential feeding to a threshing rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11812701
APP PUB NO 20200404849A1
SERIAL NO

16980993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combine harvester includes a rotor cage surrounding a rotor, a threshing space defined between the rotor cage and the rotor, and a transition section defining an infeed to the rotor cage. The transition section is mounted to the rotor cage at a location upstream of the rotor cage. The transition section has an inlet for receiving the crop material. The harvester also includes a crop conveying drum for conveying crop material to the inlet of the transition section and beneath the rotor. The crop conveying drum is at least partially encased by a shroud. The transition section includes a bottom wall, two side walls each having lower portions extending substantially vertical with respect to the bottom wall, and curved side walls each extending between the bottom wall and one of the side walls. The bottom wall is substantially tangential to a lower portion of the shroud.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1100 N MARKET STREET 4TH FLOOR SUITE 4010 WILMINGTON DE 19890

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Estock, Nicholas Mason, US 3 2
Flickinger, Wayne Oxford, US 10 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00