Film structure, shell, and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11451653
APP PUB NO 20200404086A1
SERIAL NO

16902531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A film structure, a method for manufacturing the film structure, a shell, and an electronic device are disclosed. The film structure includes a first film assembly and a second film assembly. The first film assembly includes a first film and a texture layer stacked sequentially. The second film assembly includes a second film and a ribbon unit disposed on the second film. The second film assembly is laminated on the first film assembly. The ribbon unit is located adjacent to the first film, and an orthographic projection of the ribbon unit projected on a plane on which the texture layer is located falls in the texture layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP LTDCHANGAN TOWN IN GUANGDONG PROVINCE DONGGUAN 523860 USHA BEACH ROAD NO 18 DONGGUAN CITY GUANGDONG PROVINCE 523860

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Qiu, Jinglong Guangdong, CN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00