MICRO-FUSION-BASED ELECTRICITY GENERATING FARM
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Dec 3, 2020
app pub date -
May 28, 2019
filing date -
May 28, 2019
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An electricity generating farm includes an electrical grid with a network of conductive lines and switches, and a plurality of micro-fusion-driven turbine generator units selectively connected to the grid. Each generator unit includes a source of deuterium-containing particle fuel material that can be supplied as a dispersed cloud in a columnar reaction volume. Ambient cosmic rays and muons entering the reaction volume interact with the dispersed fuel material to generate energetic reaction products that drive turbines coupled to electrical generators.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DREXLER JEROME | LOS ALTOS HILLS CA 94022 |
International Classification(s)

- 2019 Application Filing Year
- G21H Class
- 18 Applications Filed
- 10 Patents Issued To-Date
- 55.56 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Drexler, Jerome | Los Altos Hills, US | 86 | 2746 |
# of filed Patents : 86 Total Citations : 2746 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G21H Class
- 0 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jun 3, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jun 3, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
