System and method for generating origin-independent access maps

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11473928
APP PUB NO 20200378786A1
SERIAL NO

16824930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes: selecting a set of access points in a focus zone that identifies an area around the travel destination; determining access paths through one or more access points in the set of selected access points; listing crossings that the access paths pass through; for each of the listed crossings: determining a probability that the listed crossing is passed through by an access path; determining at least one complexity score of the listed crossing; determining a set of points of interest (POIs) along access paths passing through the listed crossing; and determining quality scores for the POIs, respectively, the quality score of one of the POIs reflecting a utility of that one of the POIs to facilitate orientation; selecting POIs from the set of POIs based on the quality scores; generating the access map including the access paths and the selected POIs; and outputting the access map.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAVER CORPORATION95 JEONGJAIL-RO BUNDANG-GU SEONGNAM-SI GYEONGGI-DO 13561 13561

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grasso, Antonietta Grenoble, FR 14 1460
Hoppenot, Yves Notre Dame de Mesage, FR 39 945
Langlais, Michel Pont de claix, FR 4 10
Willamowski, Jutta Grenoble, FR 5 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 18, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00