Connector for battery box of electric vehicle and battery box, electric vehicle thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11469478
APP PUB NO 20200373543A1
SERIAL NO

16876101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector includes a male connector, a female connector and a rotating clamping structure. The male connector includes a first housing with multiple channels, the female connector includes a second housing with at least one positioning slot. The rotating clamping structure includes a third housing, multiple first positioning pins, multiple stoppers and multiple second positioning pins. The rotating clamping structure can realize the locking or separation of the male connector and the female connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEFEI UNIVERSITY OF TECHNOLOGYHEFEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hao, Chengxu Hefei, CN 1 0
Hong, Haotian Hefei, CN 1 0
Hong, Zhanyong Hefei, CN 2 0
Wang, Rui Hefei, CN 821 4323
Zhai, Hua Hefei, CN 3 0
Zheng, Shulin Hefei, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00