Desulfurized tall oil and derivatives thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11041095
APP PUB NO 20200369916A1
SERIAL NO

15929779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for reducing or removing at least 90% of sulfur in a tall oil composition, e.g., to a level of 15 ppm or less is disclosed. The process employs at least a first desulfurization and a second desulfurization treatment in parallel or in series. The first treatment comprises adsorptive desulfurization, wherein the adsorbent material comprises silica adsorbent having an average pore size between 50-200 Å, BET surface area of at least 300 m2/g, pore volume of 1.20 to 3.00 cc/g, and a silanol [Si—OH] level of 0.5 to 5 unit/nm2. The second desulfurization treatment is selected from adsorptive treatment, heat treatment, distillation, extraction, oxidation, reduction, hydrogenation, and sulfur scavenging for a reduced sulfur content.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KRATON POLYMERS LLC16400 PARK ROW HOUSTON TX 77084

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Ruidong Houston, US 30 128
Reiter, Chad Savannah, US 7 1
Tian, Jason Houston, US 21 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 22, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00