Apparatuses and methods for applying pressure to edge surfaces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11000887
APP PUB NO 20200368797A1
SERIAL NO

16421904

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for applying pressure to at least a portion of an edge surface, which bridges opposing faces of a workpiece, comprises a frame, a first roller, a second roller, a rotation-control member, a first biasing member, and a second biasing member. The first roller and the second roller are coupled to the frame, rotatable relative to the frame about a first pivot axis, and translationally fixed relative to the frame. The rotation-control member is movable relative to the frame, controlling rotation of the first roller and the second roller relative to the frame. The first biasing member is coupled to the frame and is configured to operate in tension. The second biasing member is positioned, in compression, between the frame and the rotation-control member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Howard, Jesse P Arlington, US 10 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00