Bicycle sprocket, sprocket assembly, rear sprocket assembly, and drive train of bicycle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11897581
APP PUB NO 20200346713A1
SERIAL NO

16934009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle sprocket comprises at least one chain engaging member constituting at least a part of at least one sprocket tooth of the bicycle sprocket. The at least one chain engaging member is configured to contact a bicycle chain in a state where the bicycle chain engages with the bicycle sprocket. The at least one chain engaging member is made of a first material. At least one bicycle attachment member constitutes at least a part of a sprocket body of the bicycle sprocket. The at least one bicycle attachment member is configured to be coupled to a bicycle. The at least one bicycle attachment member is made of a second material that is different from the first material. At least one shifting facilitation area is provided in the at least one chain engaging member to facilitate a shifting operation of a bicycle chain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHIMANO INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwai, Tooru Sakai, JP 14 197
Nonoshita, Tetsu Sakai, JP 31 779
Yoshida, Toyoshi Sakai, JP 21 347

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00