Electromagnetic Coil-gun Launch Systems
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Oct 29, 2020
app pub date -
Apr 25, 2019
filing date -
Apr 25, 2019
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An accelerator for a projectile includes a coil; an H-bridge coupled to the coil with four relays S1-S4, and a controller to control current flow in the coil, wherein when relays S1 and S4 are on and relays S2 and S3 are off, current goes through the coil in one direction, and when the states of the relays are switched, current direction reverses, wherein switching the current direction ensures that the projectile has a positive acceleration.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ZHOU JOSHUA Z | SAN JOSE CA |
International Classification(s)

- 2019 Application Filing Year
- H01F Class
- 2356 Applications Filed
- 1613 Patents Issued To-Date
- 68.47 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Liu, Takyiu | San Jose, US | 9 | 206 |
# of filed Patents : 9 Total Citations : 206 | |||
Zhou, Joshua Z | San Jose, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01F Class
- 0 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 29, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 29, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
