Structure formed by temperature difference, method of forming the structure, and lightweight rigid assembly comprising the structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11493164
APP PUB NO 20200332941A1
SERIAL NO

16821216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structure formed by temperature difference includes an enveloped part, an enveloping part, and a low heat transfer layer. The enveloped part has a free section and an engagement section. The enveloping part defines at least one holding space corresponding to the engagement section. The holding space is dimensioned to be slightly less than the engagement section and can be thermally expanded to be larger than the engagement section by heating the enveloping part to reach a predetermined temperature difference over the enveloped part, so that the engagement section can be put into the holding space. When the enveloping part is cooled, the holding space can shrink, causing the enveloping part to tightly hold the engagement section. The low heat transfer layer, which has a thermal conductivity less than each of the two parts, is disposed in the holding space, between the engagement section and the enveloping part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MINTRON ENERGY TECHNOLOGY CO LTD2F -1 NO 268 SEC 1 GAOTIEZHANQIAN W RD ZHONGLI DISTRICT TAOYUAN CITY 320

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuang, Chia-Ming Taoyuan, TW 29 171
Huang, Chen-Sheng Taoyuan, TW 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 8, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 8, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00