Civil engineering underground equipment and method for operating civil engineering underground equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12110778
APP PUB NO 20200318469A1
SERIAL NO

16833911

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to civil engineering underground equipment comprising at least one work element for ground work, at least two actuation units, at least one measuring device for determining at least one current actuation parameter for each actuation unit, and a controller which is designed for controlling the actuation units, wherein the controller is connected to the measuring devices and, in order to prevent a tipping of the civil engineering underground equipment, is designed to limit a further actuation of the actuation unit or to display to an operator that the limit actuation parameter has been reached and/or the limit actuation parameter, on the basis of previously calculated limit actuation parameters for the actuation units which define exactly one permissible operating range, when a limit actuation parameter of at least one actuation unit is reached. It is intended for at least two different individual operating ranges to be stored in the controller, wherein each individual operating range comprises a different set of limit actuation parameters for the actuation units, and for the controller to be able to determine a combined permissible operating range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAUER MASCHINEN GMBHGERMAN SKEI ROBEN HALLSON SCHROBENHAUSEN BAVARIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elsner, Thomas Schrobenhausen, DE 23 129
Mager, Paul Hamburg, DE 1 0
Ziegler, Andreas Gachenbach, DE 45 187

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00