Drilling bucket and method for producing a bore in the ground

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10927628
APP PUB NO 20200318450A1
SERIAL NO

16840270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a drilling bucket and a method for producing a bore with a drilling bucket, wherein the drilling bucket is driven in a rotating manner and introduced into the ground, wherein ground material is removed and received in an internal space of a tubular base body of the drilling bucket, and for emptying the drilling bucket is withdrawn from the bore and a bottom on the tubular base body is folded open. According to the invention the drilling bucket is rotated in a reversing manner during emptying, wherein ground material received in the drilling bucket is pressed against at least one impact wall and, in doing so, the ground material is specifically compacted and deformed for easier loosening from the internal space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAUER MASCHINEN GMBHBAUER-STR 1 SCHROBENHAUSEN 86529

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braun, Roland Artur Aindling, DE 1 0
Denk, Fabian Vohburg, DE 4 0
Schweiger, Manfred Tandern, DE 6 5
Stimpfle-Ziegler, Andreas Kühbach, DE 7 13
Wiedenmann, Ulli Schrobenhausen, DE 15 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00