Device, system and method for transporting and installing a bop stack for an onshore drilling rig

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11549313
APP PUB NO 20200291727A1
SERIAL NO

16755552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to devices and methods for transporting a Blow Out Preventer (BOP). A device for transporting and installing a BOP stack for a land-based drilling rig, comprises a skid for transporting a BOP stack in a substantially horizontal position. The device comprises a moveable support configured to be fixed removably to one end of the BOP stack and to translate longitudinally on the skid, where a section of the skid is extendable longitudinally outwards from an end of the skid, into an extended configuration in which the section can placed adjacent to or on a place of installation of the BOP stack, and is configured to be part of the skid on which the moveable support is configured to translate, so that the moveable support may translate longitudinally onto the section of the skid, in its extended configuration, to be above the place of installation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PETROLEO BRASILEIRO S A - PETROBRAS20031-912 RIO DE JANEIRO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Valadares, Raphael Lucas Ribeiro Rio Grande do Norte, BR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00