System for converting rotational momentum into versatile linear propulsion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536254
APP PUB NO 20200277938A1
SERIAL NO

16509352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are systems for converting rotational momentum into linear propulsion. A propulsion system includes one or more thrust units with masses controllably driven by actuators to generate inertia that thrusts a vehicle with the propulsion system in a desired direction. The propulsion system can be configured to have multiple units, each configured to generate thrust in a desired direction and counteract or neutralize thrust in other directions. The propulsion system can generate thrust via two operational cycles and/or through continuous operation. The propulsion system may comprise two mirroring units, each configured to operate in mirrored synchrony to generate a net thrust in a desired direction and counteract or neutralize thrust in other or undesired directions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arbabian, Morteza Madison, US 5 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00