Valve bridge systems comprising valve bridge guide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11053819
APP PUB NO 20200263571A1
SERIAL NO

15929504

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A valve bridge system comprises a valve bridge configured to extend between at least two engine valves of an internal combustion engine. In one embodiment, a valve bridge guide is operatively connected to the valve bridge and configured to extend between at least two valve springs respectively corresponding to the at least two engine valves, the valve bridge guide defining a surface conforming to a valve spring of the at least two valve springs. In another embodiment, the valve bridge guide may comprise at least a first member maintained in a first fixed position relative to and at a predetermined distance from the valve bridge. In both embodiments, the valve bridge guide is configured to avoid contact with the valve bridge in a controlled state, but to permit contact with valve bridge to resist uncontrolled movement of the valve bridge.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JACOBS VEHICLE SYSTEMS INC22 EAST DUDLEY TOWN ROAD BLOOMFIELD CT 06002

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baltrucki, Justin D Canton, US 35 74
Benn, Steven Storrs, US 2 2
Mandell, John Vernon, US 17 23
Roberts, Gabriel S Wallingford, US 20 37
Swanbon, Bruce A Tolland, US 8 56
Yang, Dong West Hartford, US 180 1586

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00