Construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11085352
APP PUB NO 20200256232A1
SERIAL NO

16642468

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a urea water supply device (25) that is disposed in a urea water pipe line (23) to supply urea water toward a urea water injection valve (21) from a urea water tank (22). A bracket (24) for attaching the urea water supply device (25) is attached to a revolving frame (5) of an upper revolving structure (3). A cover (31) for covering the urea water supply device (25) is attached to the bracket (24). On top of that, a urea water filter (33) that is disposed in the urea water pipe line (23) and traps foreign objects mixed into the urea water is attached to the cover (31).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTD16-1 HIGASHIUENO 2-CHOME TAITO-KU TOKYO 1100015 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Toshinori Tsukuba, JP 6 47
Imi, Masaharu Tsukuba, JP 1 0
Nishiguchi, Hitoshi Tsuchiura, JP 6 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00