Power supply with envelope tracking modulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11088660
APP PUB NO 20200244225A1
SERIAL NO

16728193

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply configured to supply a modulated voltage to a power amplifier is shown. The power supply has an alternating current (AC) component generator, a direct current (DC) component generator, and a transition accelerator. The AC component generator generates an AC component of the modulated voltage according to an envelope tracking signal. The DC component generator generates a DC component of the modulated voltage according to the operational voltage range of the power amplifier. The transition accelerator is coupled to an output terminal of the DC component generator to speed up the transition of the modulated voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MEDIATEK INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ho, Chen-Yen Hsinchu, TW 24 82
Kuan, Chien-Wei Hsinchu, TW 27 122
Lin, Shih-Mei Hsinchu, TW 6 48
Meng, Che-Hao Hsinchu, TW 10 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00