Connection device for joining two pipe sections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11441711
APP PUB NO 20200240559A1
SERIAL NO

16652300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection device for joining two pipe sections in a body of water has a first tubular body having a spherical face; a second tubular body having at least one spherical face; a tubular pusher arranged about the second tubular body and having a spherical face; a first mechanism for coupling the second tubular body between the first tubular body and the tubular pusher and providing a spherical coupling between the first and the second tubular body; and a second mechanism for blocking any movement about the spherical coupling of the second tubular body with respect to the first tubular body and the tubular pusher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAIPEM S P AVIA MARTIRI DI CEFALONIA 67 SAN DONATO MILANESE 20097

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lazzarin, Diego San Donato Milanese, IT 28 60
Lucchese, Francesco San Donato Milanese, IT 5 40
Toso, Gianluca San Donato Milanese, IT 6 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00