Systems and methods to treat flue gas desulfurization waste to produce ammonium sulfate and calcium carbonate products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11148956
APP PUB NO 20200239325A1
SERIAL NO

16749860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are system and methods for producing a high purity ammonium sulfate product as well as either a lower or a high purity calcium carbonate product by reacting flue gas desulfurization (FGD) gypsum feedstock in batch or continuous mode using synthesized ammonium carbonate from ammonia and carbon dioxide gases. The high purity calcium carbonate is obtained by using a precipitation catalyst, filtering out the impurities, then precipitating a high purity calcium carbonate. Alternatively, the lower purity calcium carbonate may be dissolved in acid, impurities filtered out, then a high purity calcium carbonate is precipitated out using a soluble carbonate salt.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAVY POWERSPORTS INC360 TORMEY LANE SUITE 292 BAINBRIDGE ISLAND WA 98110

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Papouchado, Lucien Aiken, US 2 1
Preston, Joseph Bainbridge Island, US 16 1209
Scheetz, Barry E Lemont, US 9 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00