Energy dense source for pulse power applications and novel electromagnetic armor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11181344
APP PUB NO 20200225005A1
SERIAL NO

16626875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supercapacitor-like device is described that uses a porous, conductive foam as the electrodes. After the device is charged, an explosive wave front can be used to remove electrolyte from the metal foam. This creates a large net charge on each electrode, which will readily flow through a load placed across the electrodes. The removal of charge can potentially occur on a time scale of microseconds, allowing a supercapacitor to be used in pulsed power applications. The creation of this net charge requires significant energy, meaning this concept may also be suitable for removing kinetic energy from objects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BATTELLE MEMORIAL INSTITUTE505 KING AVENUE COLUMBUS OH 43201

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doolittle, Kelsey Columbus, US 2 1
Risser, Steven Reynoldsburg, US 16 232
Stasik, Mark Columbus, US 3 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 23, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 23, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 23, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00