Distance measurement between gas distribution device and substrate support at high temperatures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11408734
APP PUB NO 20200217657A1
SERIAL NO

16238891

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate processing system includes a laser triangulation sensor configured to transmit and receive light through a window of an exterior wall of a substrate processing chamber. A controller is configured to: position the laser triangulation sensor such that the laser triangulation sensor transmits light onto a measurement feature arranged between a first surface of a substrate support and a second surface of a gas distribution device, where the second surface faces the first surface; and while the laser triangulation sensor transmits light onto the measurement feature, determine a first distance between the first and second surfaces based on a difference between: a second distance between the laser triangulation sensor and the first surface measured using the laser triangulation sensor; and a third distance between the laser triangulation sensor and the second surface measured using the laser triangulation sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAM RESEARCH CORPORATION4650 CUSHING PARKWAY FREMONT CA 94538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Emerson, Mark E Newberg, US 6 9
Linebarger,, Jr Nick Ray Beaverton, US 21 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 9, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00