Camera module facilitating industrialized assembly line and electronic device with the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10756448
APP PUB NO 20200212603A1
SERIAL NO

16375320

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A camera module for facilitating industrialized water assembly includes a lens driver, a holder, a printed circuit board, and at least two conductive adhesives. The lens driver includes at least one pin. The lens driver is mounted on the holder. The pin extends from the lens driver to the holder. The holder includes at least one conductive layer corresponding to the pin. The conductive layer includes a first end and a second end opposite to the first end. The holder is mounted on the printed circuit board. One conductive adhesive connects the pin to the first end of the conductive layer, the other one conductive adhesive connects the second end of the conductive layer to the printed circuit board, that makes the conductive layer electrically connect to the printed circuit board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRIPLE WIN TECHNOLOGY(SHENZHEN) CO LTDNO 2 DONGHUAN 2ND ROAD LONGHUA YOUSONG 10TH INDUSTRIAL ZONE LONGHUA NEW DISTRICT SHENZHEN GUANGDONG 518109 SHENZHEN CITY GUANGDONG PROVINCE 518109

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Chun-Yao New Taipei, TW 102 677
Lin, Cheng-An New Taipei, TW 30 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00