Manufacture of hydrophobized nanocellulose intermediate as well as hydrophobized nanocellulose

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11174324
APP PUB NO 20200157250A1
SERIAL NO

16621833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for manufacturing hydrophobized nanocellulose comprising the steps of: a) providing a cellulose-containing material wherein the cellulose-containing material contains less than 20 wt. % water, b) contacting the cellulose-containing material with oxalic acid dihydrate, and heating above the melting point of the oxalic acid dihydrate, to obtain cellulose oxalates, c) washing the mixture, d) preparing a suspension comprising the material from step c) and e) recovering hydrophobized nanocellulose from the suspension. The present invention relates also to a method of manufacturing hydrophobized nanocellulose intermediate which comprises the above described steps a)-c). The methods disclosed in the present invention are quick, inexpensive, simple, and direct. Pulp can be used as raw material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FINECELLOX ABNACKROSVAGEN 1 SOLNA 169 37

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ek, Monica Hägersten, SE 6 2
Henschen, Jonatan Stockholm, SE 3 1
Li, Dongfang Bromma, SE 24 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 16, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 May 16, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 16, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00