Thrust vector nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10837402
APP PUB NO 20200141354A1
SERIAL NO

16738124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A thrust vectoring exhaust nozzle is disclosed. The nozzle includes an inner nozzle for changing a first degree-of-freedom of exhaust gas, an outer nozzle for changing a second degree-of-freedom of exhaust gas, a mounting bracket, a first linear actuator, a second linear actuator, a first double universal joint, and a second double universal joint. The inner nozzle is coupled to the outer nozzle. The inner nozzle is coupled to the mounting bracket. The outer nozzle is coupled to the first and second joint. When the nozzle is mounted, the inner nozzle, the outer nozzle, and the exhaust are coaxially aligned in neutral position. Actuation of the first and second linear actuators drives the first and second double universal joints independently to each other. The independent motion of the first and second double universal joints rotates the inner and outer nozzles simultaneously about the exhaust in a horizontal direction and vertical direction enabling thrust vectoring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXOVOLAR INDUSTRIES CORP600 PALISADE AVE STE 213 UNION CITY NJ 07087

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Guanhao Jersey City, US 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00