Exhaust gas purification system for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10823026
APP PUB NO 20200132036A1
SERIAL NO

16572848

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

At the start of the engine, when the temperature of the catalyst is less than the activation temperature, control for activating the catalyst (i.e., activation control) is performed. In the activation control, the first and second discharge actions of the ignition apparatuses are controlled. The first discharge action is performed to ignite the mixed gas in the cylinder. The second discharge action is performed to generate ozone. The first discharge action is performed immediately after the start of the cranking. The first discharge action is performed in the crank angle section at the retard side rather than the compression TDC. The first discharge action is performed in every cylinder. The second discharge action is performed before the start of the cranking. The second discharge action is performed in the other cylinder except for the initial combustion cylinder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ashizawa, Takeshi Yokohama, JP 40 208

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00