SOLIDIFICATION TECHNIQUES FOR LOW SOFTENING POINT PETROLEUM PITCH
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Apr 23, 2020
app pub date -
Aug 28, 2019
filing date -
Oct 23, 2018
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
This alternative fuel is a reclaimed waste product which has a solid, particulate consistency at ambient temperature. The fuel comprises a composite of petroleum pitch and a powder coating. The powder coating penetrates into the surface of the pitch. The powder coating is recycled ash, pulverized coal, or pulverized petroleum coke.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
MARATHON PETROLEUM COMPANY LP | 539 SOUTH MAIN STREET FINDLAY OH 45840 |
International Classification(s)

- 2019 Application Filing Year
- C10L Class
- 432 Applications Filed
- 249 Patents Issued To-Date
- 57.64 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Nicholson, Jeffrey Allen | Lexington, US | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- C10L Class
- 61.51 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Oct 23, 2027 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 23, 2031 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
