Process for the production of OSB wood-based boards with reduced emission of volatile organic compounds (VOCs)

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11007668
APP PUB NO 20200108523A1
SERIAL NO

16497535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a process for the treatment of wood strands suitable for the manufacture of OSB boards, in which the wood strands are treated with steam without drying after extraction, the steam being passed over the wood strands at a temperature between 80° C. and 120° C. and a pressure between 0.5 bar and 2 bar. Also disclosed is a process for the production of OSB wood-based boards including the steps of a) producing wood strands from suitable wood logs; b) treating at least part of the wood strands with steam; c) drying the steam-treated wood strands; d) gluing the steam-treated and dried wood strands and gluing the non-steam-treated wood strands with at least one binder; e) scattering the glued wood strands onto a conveyor belt; and f) pressing the glued wood strands into an OSB wood-based board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWISS KRONO TEC AGMUSEGGSTRASSE 14 6004 LUZERN 6004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kalwa, Norbert Horn-Bad Meinberg, DE 75 328

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00