Vehicle control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10934989
APP PUB NO 20200102928A1
SERIAL NO

16518237

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle control apparatus includes input-side and output-side rotating elements, a fuel injection controller, and an ignition timing controller. The ignition timing controller controls ignition timing of an engine to first timing on the condition that the engine is controlled from a fuel cut state to a fuel injection state, and afterwards, changes the ignition timing to second timing on advance side of the first timing. The ignition timing controller changes the ignition timing toward the second timing at a first change rate until a rotational acceleration rate of the output-side rotating element reaches a threshold. After the rotational acceleration rate of the output-side rotating element reaches the threshold, the ignition timing controller changes the ignition timing toward the second timing at a second change rate greater than the first change rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATION1-20-8 EBISU SHIBUYA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kinoshita, Takahiro Tokyo, JP 60 197
Shimizu, Hirofumi Tokyo, JP 53 535

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00