Boiler Feed Tank Energy Recapture System
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
N/A
Issued Date -
Jan 23, 2020
app pub date -
Jul 26, 2019
filing date -
Jul 26, 2019
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An apparatus and method for recovery of waste heat in a boiler system, wherein heat from the low pressure steam in the feed water tank, which otherwise would be lost through dissipation, is used for other applications. Particularly, the waste heat energy recovered in the form of low pressure steam can be used to heat make-up water for the boiler system.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DANIEL STEAM INC | 4025 SPENCER ST #301 TORRANCE CA 90503 |
International Classification(s)

- 2019 Application Filing Year
- F22D Class
- 18 Applications Filed
- 13 Patents Issued To-Date
- 72.23 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Yoon, Yong K | Torrance, US | 3 | 36 |
# of filed Patents : 3 Total Citations : 36 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F22D Class
- 0 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 23, 2027 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 23, 2031 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
