Automated process for the manufacture of at least one printed work from at least one sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10843498
APP PUB NO 20190344600A1
SERIAL NO

16407529

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a process and a system for the digital printing of printed publications, for the flexible production, on demand, of a single publication or small series of publications. The process of the invention is an automated process for the manufacture of at least one publication printed from at least one sheet, comprising the steps wherein:

    a plurality of pages (1, 4, 5, 8) of the publication is printed (A) on the sheet (10) thatis moved through a series of stations wherein, subsequently,the sheet (10) is folded (C) in half perpendicular to the direction of travel;the folded sheet (10) is pivoted (D) by 90° with respect to the direction of travel, andthe edges (18, 19) of the folded sheet are trimmed to obtain separate, superposed leaves (16, 17).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
C P BOURG S A1490 COURT-SAINT-ETIENNE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bourg, Charles Woluwe-Saint-Lambert, BE 2 3
Renard, Fabian Court-Saint-Etienne, BE 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00