Cellulose resin composition, molded body and product using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10941282
APP PUB NO 20190330450A1
SERIAL NO

16309977

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cellulose resin composition comprising a cellulose resin, a high refractive-index organic material and a carbon black, in which the cellulose resin is an acylated cellulose obtained by substituting at least part of hydrogen atoms of hydroxy groups of a cellulose with an acyl group having 2 to 4 carbon atoms, the carbon black is an acidic carbon black, the mass fraction (B/A) of the high refractive-index organic material (B) to the cellulose resin (A) falls within the range of 10/90 to 70/30, and the content of the carbon black (C) relative to the total of the cellulose resin composition falls within the range of 0.05 to 10% by mass.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC CORPORATION7-1 SHIBA 5-CHOME MINATO-KU TOKYO 108-8001
YUTARO SHIMODEGRAN SITIO KYOTOSIJYO805 467 KOJINCHO BUKKOUJI-SAGARU SAMEGAI-DORI SHIMOGYO-KU KYOTO-SHI KYOTO 600-8460

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iji, Masatoshi Tokyo, JP 70 519
Ishihara, Kunihiko Tokyo, JP 43 326
Shimode, Yutaro Kyoto, JP 1 1
Toyama, Kiyohiko Tokyo, JP 18 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00