Valve timing adjustment device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10858965
APP PUB NO 20190323392A1
SERIAL NO

16502333

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A retard supply passage connects between a hydraulic oil supply source and a retard chamber through a hydraulic oil controller. An advance supply passage connects between the hydraulic oil supply source and an advance chamber through the hydraulic oil controller. A drain passage and a drain passage connect the retard chamber and the advance chamber to an oil discharge portion, respectively. A recycle passage connects the drain passage and the drain passage to the retard supply passage and the advance supply passage, respectively. A recycle check valve enables only a flow of hydraulic oil from the drain passages toward the retard supply passage and the advance supply passage in the recycle passage. The recycle passage is connected to the drain passages at an inside of the hydraulic oil controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mitsutani, Tetsuro Kariya, JP 11 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00