X-ray tube

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10825641
APP PUB NO 20190318903A1
SERIAL NO

16380259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An X-ray tube includes a metal portion in which an X-ray emission window is provided, an insulation valve which is joined to the metal portion and forms a vacuum region in cooperation with the metal portion, and a target and an electron gun which are accommodated in the vacuum region. The insulation valve has a low resistivity glass portion joined to the metal portion, and a high resistivity glass portion for fixing an anode including the target. A volume resistivity of a material forming the low resistivity glass portion is lower than a volume resistivity of a material forming the high resistivity glass portion. According to this configuration, electrification of the insulation valve is curbed, so that deterioration in withstand voltage ability of the insulation valve is curbed, and electric discharge caused by electrification is curbed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMAMATSU PHOTONICS K K1126-1 ICHINO-CHO HIGASHI-KU HAMAMATSU-SHI SHIZUOKA 435-8558

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inazuru, Tutomu Hamamatsu, JP 26 385
Ishii, Atsushi Hamamatsu, JP 270 5012

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00