High-density powder pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11536296
APP PUB NO 20190293092A1
SERIAL NO

16316656

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a pump for high-density powder transfer. The pump for high-density powder transportation according to the present invention has four-stroke operation, in which four pumping chambers in reality constitute a system of two pairs of chambers in line with each other. This makes it possible to divide the overall flow rate per minute over four tanks. Each of the four tanks has a reduced capacity, to the benefit of the compactness of the pump and the reduction of the loading/emptying times of the single tank, by exploiting the fluid-dynamic principle of communicating vessels the system of pairs of chambers in line increases the overall powder storage volume, thanks to a constant depression.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERNE TECHNOLOGY S R L20121 MILANO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fiocchi, Lodovico Sarandi Grande, UY 1 1
Perillo, Carlo Lecco, IT 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00