Transport device and method for transporting objects from work station to work station of a production system and production system for the manufacturing of products with a transport device of this type

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10646971
APP PUB NO 20190283193A1
SERIAL NO

16318377

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transport device is provided that includes a rotary object carrier which includes object carrier elements arranged so as to be distributed around the circumference, on which carrier elements objects are arranged which are transported on a circular movement path from work station to work station of a production facility. A production facility for making products is also described as well as to a method for transporting objects from work station to work station of a production facility. The transport device has one or more actuator units assigned to one or more object carrier elements which units can move together with the object carrier elements. The actuator units can be provided with media by a central supply device by way of a rotary feedthrough.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FRESENIUS MEDICAL CARE DEUTSCHLAND GMBHELSE-KROENER STRASSE 1 BAD HOMBURG 61352

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heppe, John St. Wendel, DE 18 359

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00