High pressure tank apparatus and method of controlling same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11085583
APP PUB NO 20190277446A1
SERIAL NO

16293013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A high pressure tank of a high pressure tank apparatus includes: a resin-made liner; a reinforced layer; a supplying/discharging hole to which a supplying/discharging flow path is connected via a connecting section; and a supplying/discharging-side lead-out hole that leads out a fluid interposing between the liner and the reinforced layer. A leaked fluid storage section is capable of storing a leaked fluid that has leaked from the connecting section. A supplying/discharging-side discharge flow path is provided independently from the leaked fluid storage section, and, when an opening/closing valve opens, discharges to the air a temporary release fluid that has been led out via the supplying/discharging-side lead-out hole. A control section, when it has judged, based on a detection result of a detecting unit, that there is a condition enabling the temporary release fluid to be discharged, opens the opening/closing valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ogiwara, Naoki Wako, JP 23 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00