Fence post straightening device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11548047
APP PUB NO 20190275577A1
SERIAL NO

16349604

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A three blade fence post straightening device comprises a first row of at least three rollers and a second row of at least three rollers. An axis of rotation of each of the rollers in the first row may be substantially parallel to each other and an axis of rotation of each of the rollers in the second row may be substantially parallel to each other. A forming profile defined between outer surfaces of the respective rollers of each pair of rollers may substantially correspond to a cross section of a three blade fence post, with forming profiles of each pair of rollers being longitudinally aligned to form a substantially straight path through the straightening device. A drive means may be configured to drive each of the rollers in the first row and/or the second row.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DJI INNOVATIONS PTY LTD23 VERA COURT MUDGEE NEW SOUTH WALES 2850

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Irving, Daryl Mudgee, AU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 10, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00