Plant for the production and the packaging of steel bars or rods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11484923
APP PUB NO 20190275574A1
SERIAL NO

16422570

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plant for the production and packaging of bars and steel profiles includes a rolling station of rods and profiles of indefinite length, a cooling station, a scrap separation station, a diverter device, cutting shears, intended to cut said bars and profiles in bar portions having a fixed length, and a speed changing device, able to move the bar portions at a speed rate such that they can be placed within respective grooves or housing provided on the outer surface of at least one cylinder or rotating drum. Each cylinder or rotating drum is associated with a speed changing device, so that the housing receives bar portions at different speeds, depending on the fact that the housing belong to one first or to at least second rotating cylinder, in order to avoid overlap of the bar portions when the same are discharged onto the cooling plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMS MEER S P A33017 TARCENTO (UD)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Castellani, Federico Tarcento UD, IT 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 1, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 May 1, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00